Spill Containment Verification
Hydrostatic Spill Bucket & Secondary Containment Testing
USTEX provides independent hydrostatic spill containment testing and functional verification of all spill containment components under EPA 40 CFR §280.43. Conflict-free assessment of fillport spill buckets, dispenser sumps, overfill prevention valves, and interstitial monitoring systems.
Spill Containment Testing Services
- Hydrostatic Spill Bucket Testing — Controlled hydrostatic testing of fillport spill containment manholes to verify liquid-tight integrity per EPA 40 CFR §280.43(g).
- Dispenser Sump Integrity Testing — Testing of dispenser containment sumps for water infiltration and product leakage pathways.
- Transition Sump Verification — Inspection of underground piping transition sumps at tank top connections.
- Overfill Prevention Device Testing — Functional testing of ball float valves, flapper valves, and automatic shutoff devices at 90% capacity per EPA 40 CFR §280.43(h).
- Fill Cap & Port Inspection — Visual inspection of fill caps, drop tubes, and fillport components for wear and proper sealing.
- Secondary Containment Interstitial Monitoring — Assessment of interstitial monitoring systems in double-wall tanks and piping.
Regulatory Framework
EPA 40 CFR §280.43 • EPA 40 CFR §280.20 • Wisconsin ATCP 93 • WIDATCP Specialty Firm #560989 • PEI RP100
All Services | Schedule Containment Testing | UST Compliance Testing