(414) 301-3645
Menu
Home Videos
USTEX · Videos

Underground fuel systems and testing

Watch the system in operation, then explore the testing methods and evidence behind a useful report.

3D animation · 1:00 · Narrated

FEATURED / 03

The Invisible Station

A one-minute look beneath the forecourt at underground tanks, piping, monitoring probes and containment systems. This narrated 3D animation shows the equipment behind the fuel stop.

Have inspections coming due?

Send Doug your facility information and the testing you need so he can confirm the scope and scheduling.

Request testing

Full film · 10:12 · Narration and on-screen captions

TESTING / 02

What did the test prove?

A closer look at tank and line tightness testing, sensor checks, containment testing, PEI recommended practices, equipment manufacturers, and independent method evaluations such as those performed by Ken Wilcox Associates.

Jump to a section

An educational explainer using manufacturer photographs, an engineering drawing and explanatory graphics. Follow the complete accepted procedure and applicable requirements for your installation.

Need testing for your site?

Tell Doug which equipment needs testing and what documentation you need.

Request testing
Read the testing film transcript

What did the test prove?

A passing result is useful when the report makes clear what was tested and what that result establishes. Tank tightness, sensor operation and liquid containment each need their own evidence. This video walks through the testing used on an underground storage tank system, the role of the equipment and procedures, and the information an owner should expect to find in the report.

Three questions. Three kinds of proof.

A tank tightness test measures whether the tank is leaking under the conditions specified for the test method. A sensor function test checks whether the monitoring system detects the required test condition and reports it on the correct channel. These tests provide different evidence, so the report should identify the component tested, the procedure used, the site conditions and the measured result. Containment testing checks whether a spill bucket or sump can hold liquid. The scope should cover the required components and define the acceptance criteria before the visit.

PEI gives the work a framework.

The Petroleum Equipment Institute publishes recommended practices that help organize this work. Recommended Practice twelve hundred covers testing and verification of release detection and release prevention equipment, while Recommended Practice nine hundred covers routine inspection and maintenance. For each job, the technician needs to check the applicable rules, the accepted procedure and the manufacturer's instructions. A checklist supports the process when the person using it understands the installed equipment.

Measure change. Account for conditions.

A volumetric tank test measures changes in liquid level or volume over time and accounts for temperature and other influences on the measurement. Some methods use mass measurements instead. The test needs to distinguish a leak from normal changes in the tank, using the conditions and stabilization time specified for that method. The report should document the relevant site conditions so someone reviewing the result can understand how the measurement was obtained.

Listen for a leak pathway.

An acoustic tank test uses vacuum and listens for air entering through a leak pathway. Estabrook's EZY three system is one example of this approach, which uses a different measurement from a volumetric test. Groundwater, background noise and tank construction can affect the result, so the technician needs to follow the procedure and evaluation for the specific model. The photograph shows actual Estabrook equipment as an example of the hardware used for acoustic testing.

An inconclusive test needs a next step.

The EZY three evaluation describes conditions that can limit the test. High background noise can make a result inconclusive, and certain groundwater conditions require additional checks for water entering the tank and more test time. An inconclusive result means the test did not establish a valid answer. The report should describe the condition that prevented a valid result and the next step needed to complete the assessment.

Precision test. Leak-detector test.

A precision line tightness test measures whether product piping meets the applicable tightness criterion. An automatic line leak detector test verifies a different function. The federal line tightness criterion is a leak rate of zero point one gallon per hour at one and a half times the operating pressure. For an automatic line leak detector, the criterion is three gallons per hour at ten pounds per square inch within one hour. A passing detector test does not establish the precision tightness result.

The setup affects the answer.

The technician needs to identify the line and configure the test according to the procedure for the equipment being used. Trapped vapor can interfere with precision testing, so the report should include the actual readings and relevant conditions. A line leak detector test verifies the detector's response to a simulated leak. Normal dispenser operation alone does not establish whether the detector responds correctly to that test condition.

Monitoring and operability differ.

An automatic tank gauge can track inventory and provide release detection when configured for the appropriate method. Checking the operation of the console, probes, sensors and alarms provides separate evidence about the monitoring equipment. The Veeder-Root TLS four fifty plus shown here is one example of a tank gauge. A normal display does not establish that every connected device responds correctly, so the function checks need to follow the applicable procedure.

Follow the signal all the way through.

Sensor testing follows the signal from the field device to the console and includes the shutdown response where the system requires one. The technician inspects the device's condition, movement and connections, then applies the test stimulus specified for that sensor. The correct alarm should appear on the correct channel. After the check, the sensor and operating settings need to be restored so the system is ready to return to service.

Can it hold what it must contain?

Containment testing checks whether a spill bucket or an applicable containment sump is liquid tight. A hydrostatic test uses the liquid level, duration and acceptance criteria specified by the procedure. Other accepted methods may use pressure or vacuum. The technician checks seams and penetrations and records the actual readings using the complete procedure for that installation. A fill level or duration taken from a different procedure is not automatically valid for the equipment being tested.

A lower level has conditions.

A low-level sump test can be used only when the installation meets the conditions of the accepted procedure, including the required shutdown function. Certain double-wall systems with the required monitoring can qualify for different testing requirements. Those conditions need to be checked before selecting the method. Planning also includes collecting, handling and disposing of the test liquid, with the system restored and ready to operate when the work is complete.

Does prevention activate correctly?

Overfill prevention verification starts with identifying the installed device and the accepted procedure for that model. The technician checks its condition and activation level, using the checks appropriate to an alarm or a mechanical shutoff. A fuel delivery does not replace a controlled test. Qualified personnel need to control the work area, follow the procedure and restore the system after the verification is complete.

Choose by method. Then by hardware.

Equipment selection follows the method that fits the site. Estabrook makes acoustic tank-testing equipment, and Purpora Engineering offers tank and line testing systems including Alert and Petro-Tite. Veeder-Root and Franklin Fueling Systems make tank gauging and monitoring equipment. These manufacturers serve different testing needs. A proposal should identify the model, software version, accessories and evaluated procedure that the contractor plans to use for the installation.

The operator is part of the method.

A reliable result depends on a qualified operator using the right equipment and a procedure that fits the installation. The technician's current training and any certification required by the manufacturer, method or jurisdiction need to be checked. Instrument calibration and verification records should meet the requirements of the procedure. General field experience alone does not establish qualification for every testing method.

KWA evaluates method performance.

Ken Wilcox Associates independently evaluates leak detection methods under controlled conditions. The test program includes cases with known leaks and cases with no leak, following the applicable evaluation protocol. The evaluation documents the method's performance and limitations. That work establishes evidence about the method itself, while a contractor's field test assesses the equipment installed at a customer's site.

Performance is a statistical claim.

For methods covered by these federal performance criteria, the target is at least ninety-five percent probability of detection and no more than five percent probability of a false alarm. Those percentages apply to a specified leak rate and defined test conditions. They do not guarantee that every field test will detect every leak. The leak rate, conditions and method limitations need to be read together to understand the performance claim.

Reviewed listing ≠ universal approval.

The National Work Group on Leak Detection Evaluations reviews evaluation reports and maintains method listings. It does not conduct the evaluations itself. A listing is not an endorsement by the Environmental Protection Agency, and acceptance can differ by jurisdiction. Federal rules require documented performance for applicable methods without requiring Ken Wilcox Associates to be the only evaluator. Acceptance should be confirmed with the agency responsible for the site.

Read beyond the brand name.

The model and version need to match the product, tank capacity and fill range at the site. The method's evaluation also identifies stabilization requirements, groundwater limits and other restrictions. An evaluation for one configuration does not automatically cover another. Detection performance and material compatibility address separate questions, so a leak detection listing does not establish long-term material compatibility.

A useful report shows its work.

A useful field report identifies the component, method revision, instruments and technician, and records the site conditions, test duration, readings and acceptance criteria. It should state whether the result was pass, fail or inconclusive and document the required next action and restoration of the equipment. These details let someone reviewing the report follow the evidence and give the owner a record that supports the next decision.

Compare the complete scope.

For an owner or business buyer, the total cost includes travel, setup, stabilization time, downtime, handling test liquid and possible retesting, as well as the test fee. Proposals are easier to compare when they cover the same equipment and reporting requirements. Missing part of the scope can lead to another visit and more disruption. A valid answer, a clear next step and useful documentation help the owner assess the value of the work.

The result matters. So does the evidence.

When reviewing a report, check what was tested, which method was used and whether that method was valid for the conditions at the site. The report should preserve the readings, limitations and next action so the result can support a practical decision. That evidence is what makes testing useful to the people responsible for the system. USTEX.

Full film · 4:16 · Narration and on-screen captions

Download the full video

FUEL SYSTEMS / 01

Follow the fuel

Go beneath the forecourt to see a normal premium sale, then a separate tanker delivery. Follow the fuel and vapor paths and see how containment, monitoring, and overfill protection fit into the system.

Jump to a section

Created with AI-assisted research and production using equipment references. This educational reconstruction shows a representative system; site configurations vary.

Have a question about your site?

Tell Doug what your equipment is doing and what you need to understand.

Talk to USTEX
Read the full transcript

A customer selects premium. What happens beneath the forecourt determines whether that sale is safe, accurate, and profitable. Follow the fuel, and the systems protecting it. After authorization, the dispenser requests fuel. The pump controller energizes the premium tank’s submersible pump. Power operates equipment; communication carries commands. Neither is a fuel path. Inside the premium tank, the submerged pump pushes gasoline through its column and manifold into the product line. The check valve helps retain pressure when pumping stops. The regular tank remains idle. The inner pipe carries pressurized fuel. The outer wall provides secondary containment. The space between them is not a normal fuel or vapor route. Sound connections and monitored containment help reveal a release before it escapes. At the dispenser, pipe entries and fittings sit inside a containment sump. A low-point sensor can detect collected liquid. Above it, the anchored shear valve is designed to close if impact displaces the dispenser. Each safeguard has a different job. Fuel passes through filtration, metering, and control components. Meter pulses support the displayed volume; valves regulate delivery. This premium sale uses the premium stream alone. Blended grades use both supply streams, according to the configured blend. The hose carries fuel to the nozzle. A breakaway is designed to separate and limit discharge during a drive-off. The nozzle’s automatic shutoff responds when liquid covers its sensing port. Keep the engine off and attend the sale. As gasoline enters the vehicle tank, displaced vapor travels to the vehicle’s charcoal canister. That is onboard refueling vapor recovery. Stored vapor is purged later during engine operation. A separate station Stage Two recovery system is not shown operating here. The tank probe measures product level, water level, and temperature. The automatic tank gauge combines inventory information with configured sensor inputs. Tank interstitial, sump, and line monitoring cover different failure paths. An alarm does not prove every site has automatic pump shutdown. Intrinsically safe probe and sensor circuits remain distinct from power and other wiring. The gauge reports conditions; the pump controller runs the pump. Correct interfaces, documented alarm response, and qualified service turn those signals into useful protection. Later, a tanker replenishes the regular tank through its fill connection and drop tube. The spill bucket contains small transfer spills. The mechanical overfill valve restricts delivery as the tank approaches its designed limit. It is separate from the gauge’s high-level alarm. During that delivery, displaced tank vapor returns to the tanker through the Stage One connection. The pressure-vacuum vent serves a different role: controlling tank breathing at its operating thresholds. Delivery vapor return, vehicle vapor capture, and tank venting are distinct systems. For operators, reliability has a measurable business value. As an example, four hours of lost sales at three hundred gallons per hour and thirty cents contribution per gallon equals three hundred sixty dollars. That excludes repairs, cleanup, and lost store purchases. Use your own volumes, margins, service history, and alarm records to prioritize maintenance. The goal is a system that delivers accurately, contains releases, and makes faults visible. Which component would you inspect first?

About this visualization and asset credits

Equipment geometry is reconstructed from references, including Gilbarco Encore, OPW, and Veeder-Root documentation. It is not manufacturer CAD or an installation drawing. Flow markers explain paths rather than simulate physical flow. The downtime example uses hypothetical business inputs.

Vehicle assets adapted from BMW M3 Sedan topaz blue car by stefrolland and Tanker Truck by ezbreneman, under CC BY 4.0. Models were optimized and transformed; representative fuel connections and vehicle internals were added.

Call now Request dispatch