Forms and documents
The paperwork operators ask us for
Wisconsin DATCP storage tank forms under ATCP 93, current as published by the agency. Each row downloads the current PDF.
| Reference | Document | Use |
|---|---|---|
| TR-WM-152 | Tank Precision Tightness Test Report | Tank precision tightness test report. The form the result is reported on. |
| TR-WM-125 | Line Precision Tightness Test Report | Line precision tightness test report. |
| TR-WM-123 | Line Leak Detector Functionality Test Report | Line leak detector functionality test report. The annual most often cited as missing. |
| TR-WM-141 | UST Corrosion Protection Test/Survey Report | UST corrosion protection test and survey report. |
| TR-WM-139 | Annual Underground Tank System Functionality Verification | Annual underground tank system functionality verification. |
| TR-WM-155 | Pre-Operational Tank Tightness Test | Pre-operational tank tightness test, run before a system is placed in service. |
| Reference | Document | Use |
|---|---|---|
| TR-WM-140 | Checklist and Report for Tank Closure (TSSA), Parts A and B | Checklist and report for tank closure, Parts A and B. Part A is due within 21 business days of closure. |
| Reference | Document | Use |
|---|---|---|
| TR-WM-121 | Contractor - ATCP 93 Notification | Contractor ATCP 93 notification. Filed with DATCP at least 5 business days before a tank system project starts. |
| TR-WM-137 | Underground Flammable/Combustible Liquid Storage Tank Registration | Underground flammable and combustible liquid storage tank registration. |
| TR-WM-118 | Aboveground Flammable/Combustible Liquid Storage Tank Registration | Aboveground flammable and combustible liquid storage tank registration. |
| TR-WM-153 | Storage Tank Change of Ownership | Storage tank change of ownership. |
| Reference | Document | Use |
|---|---|---|
| PEI RP900 | PEI RP900 Monthly UST System Inspection Checklist | PEI RP900 monthly UST system inspection checklist, an owner and operator obligation. |
| PEI RP900 | PEI RP900 Annual UST System Inspection Checklist | PEI RP900 annual UST system inspection checklist. |
Need a form that is not listed, or a notification for one of the other eleven states we cover? Call and we will send the current version with the fields that apply to your site already identified.
Request site dispatch
Tell us what your site is facing
There is no sales process. You receive a direct answer on what it takes to bring the site into compliance, from the technician who will perform the work.
Prefer to talk? Call directly:
(414) 301-3645- Hours
- Mon to Fri, 07:00 to 17:00 CT
- Response
- Same day
- contact@us-tex.com
- Based
- Based out of Jackson, Wisconsin
- Licensed
- DATCP #560989 · UEI WG4NCXK3XCA5 · CAGE 191X7
Site dispatch request
Your request could not be submitted.The fault is on our side. Call (414) 301-3645 and we will take the details by phone.
Request received.We will respond the same business day. If the site is down now, call (414) 301-3645.